past musings & working drafts

Letters, public comments, essays, and working drafts by Ernie Kee that were never formally published. Letters and comments that were sent or submitted appear exactly as written, with a short background page in front. Unsent drafts have been lightly edited for clarity. Each keeps its original date.

Letters and public comments

Letter to the President on NRC regulation

February 2025 · PDF

Argues against weakening the NRC’s safety framework under NEIMA, the ADVANCE Act, and the Loper Bright decision, and proposes a faster route to licensing: second applicants’ engineering staff to the NRC instead of charging added fees. Copied to the Texas governor, congressional energy committees, the Secretary of Energy, and the NRC commissioners.


Comments on recent nuclear power legislation: a critical review of the ADVANCE Act and NEIMA

October 2024 · NRC ADAMS ML24295A085 · PDF

Argues that, without extensive accident data, numerical estimates of reactor accident probability rest on flawed science, and that commercial nuclear power’s safety record comes from the NRC’s prescriptive regulation of protections.


Comments on the NRC report to Congress on environmental reviews

October 2024 · NRC ADAMS ML24276A196 · PDF

Written after the NRC’s September 25, 2024 public meeting on its ADVANCE Act report to Congress on efficient, timely, and predictable environmental reviews for reactor applications.


Comments on ADVANCE Act implementation and reactor oversight

December 2024 · PDF

Written after the NRC’s December 10, 2024 public meeting on staff efforts under the ADVANCE Act, on changes to how inspection findings are reported and on how the ADVANCE Act and NEIMA bear on NRC oversight.


A note to congressional staff on advanced reactor technology and funding

December 2020 · PDF

An engineer’s perspective on advanced reactor technology and research funding, written after the December 17, 2020 public meeting of the National Academies committee on Laying the Foundation for New and Advanced Nuclear Reactors in the United States.

Essays and working drafts

Liable without control: a risk-economic framework for managing a waste generator’s Superfund liability

Draft manuscript, July 2026 · data & code · PDF

Under Superfund law, a company that ships waste to a licensed facility can be made to pay for a later cleanup however carefully it chose that facility. This draft treats the choice of facilities as a problem of minimizing expected loss and argues for a graduated severity classification and a Price-Anderson-style financial-responsibility regime.

About the rejection. The draft was submitted to Reliability Engineering & System Safety in July 2026 and rejected by the editor before peer review. No decision letter was received and no reason was given, so why it was declined is not known. Because it was never reviewed, it should be read as an unreviewed working draft. It is not being pursued for journal publication.


Informing their discretion: public acceptance as infrastructure for the AI buildout

Working draft, July 2026 · PDF

Argues that the binding constraint on AI data-center growth is now public permission rather than megawatts, water, or capital, drawing lessons from William Ruckelshaus’s handling of the 1983 Tacoma smelter decision.


Taking advantage of recent laws: efficient licensing pathways for advanced reactors

Preliminary draft, July 2026 · PDF

A licensing roadmap for advanced reactors that takes advantage of the ADVANCE Act, the 2025 executive orders, and the final Part 53 rule. It is built on the ARISE framework: regulation scoped to containment, a bounded source term, containment performance judged by energy balance and simulation, and a safety-margin criterion suited to performance-based oversight.


Protective systems: regulation and grid stability

March 2021 · PDF

Written after the February 2021 Texas blackout. It looks at how protective systems, production systems, and regulation interact to keep energy available to the people who depend on it.


Consideration for hurricane risks during the COVID-19 pandemic

April 2020 · PDF

A short HazTechRisk note urging communities to plan pandemic-safe hurricane evacuations before the season began, modeled on the staged response nuclear plants use as a storm approaches.


Who pays? Hazardous technologies after COVID-19

Draft op-ed, March 2020 · PDF

The pandemic as a hazard we knew would come, and the question of who benefits and who pays when protective standards are traded for cheaper goods.